After the preliminary review and the application is accepted, how long is the wait to appear before the Board?

Generally, it takes one to two months after filling to appear before the board.

The entire process from start to finish takes roughly 3 months.

Show All Answers

1. Does this require a permit ?
2. Where is my septic system located?
3. Am I in a Flood Zone ?
4. I want to buy/build a shed do I need a permit?
5. I want to install a fence do I need a permit?
6. I want to build or repair a dock?
7. I am installing a pool do I need a permit?
8. I am replacing my roof shingles, do I need a permit?
9. I am replacing my siding do I need a permit?
10. I am replacing my existing deck do I need a permit?
11. I am replacing my decking and railings without modifying it, do I need a permit?
12. I am replacing my kitchen cabinets do I need a permit?
13. I am installing replacement windows, do I need a permit?
14. I am installing new windows do I need a permit?
15. I want to finish my basement do I need a permit?
16. I am replacing my flooring do I need a permit?
17. I want to build an addition or a dormer do I need a permit?
18. I want to install a sign for my business do I need a permit?
19. Do I need to be a registered or licensed contractor to do work on my own dwelling?
20. What can I do about mold?
21. ZONING BOARD OF REVIEW – FAQ’S:
22. How do I apply for the Zoning Board of Review
23. What documentation is needed at a preliminary review?
24. How do I create a Radius Map and Abutters List?
25. After the preliminary review and the application is accepted, how long is the wait to appear before the Board?
26. What should be expected at the hearing?
27. The Board has approved/denied the application, what happens next?
28. Does the variance or special use permit expire?
29. Is there any recourse if my application is denied?
30. How do I apply for the Zoning Board of Review