- Home
- Government
- Departments
- Public Works & Utilities
- Schedule of Fees
Schedule of Fees
Solid Waste User Fees
The fees listed below are for South Kingstown and Narragansett residents only. These fees do not apply to commercial businesses or residents of other towns. Please inquire with the transfer station directly for commercial rates (401-783-4554).
Item/Service | Fee |
---|---|
Bulky Loads (Residential) | $0.0775/lb ($5 minimum) |
Bulky Yard Waste Loads (Residential) | $0.035/lb ($5 minimum) |
Refrigerant (Freon) Appliances | $19.25 each |
Non-Refrigerant (Non-Freon) Appliances | $6.30 each |
Recyclable Mattress and Box Springs (Limit 3 per Visit) | ** Free |
Non-Recyclable Mattresses and Box Springs | $85 per piece |
Refuse Tags (South Kingstown Narragansett Residents ONLY) | $2.25 per tag |
Tires 18” and Under | $8/tire |
Tires over 18” | $14/tire |
Yard Waste Tags (South Kingstown Narragansett Residents ONLY) | $1.25 per tag |
Please Note: Refuse Tags are sold in sheets of 5 and individually in May and June.
Yard Waste Tags are sold individually. All Tags expire on June 30 of each year.
** Free Recyclable Mattress/Box Spring Disposal for South Kingstown and Narragansett Residents Only
Private Hauler License Fee: $1,000/year (effective July 1, 2008)
Wastewater Management
Permit/License | Fee |
---|---|
Sewer Permit | $10 |
Wastewater Discharge Commercial Permit | $100 per year |
Wastewater Discharge Industrial Permit | $1,000 per year |
Wastewater Discharge Septage Hauler Permit (Yearly License) | $200 per year |
Wastewater Discharge Zero Discharge Industrial User Permit | $100 per year |
Construction Inspection
Service | Fee |
---|---|
Individual Residential House and Actual Cost Non-Residential Lateral Inspections | $25 minimum |
New Residential Projects lot/unit | $100 per dwelling |
Wastewater System Assessment Charge
The cost of said connection shall be paid in full upon approval for actual physical connection to the wastewater system or may be paid in 5 equal annual installments at 12% interest annually on the unpaid balance. The first installment shall be due and payable prior to issuance of the physical connection permit; provided, however, if the total amount is less than $9,000, then the minimum principal payment of $1,800 per annum shall be mandatory, except for the final year.
New sewer connection in streets or rights-of-way and/or new constructions to presently connected commercial and/or industrial buildings which increase the building footprint and wastewater flow, exclusive of properties where liens were established in the Middlebridge System on October 30, 1992 and November 2, 1992:
Service | Fee |
---|---|
Accessory Apartment | $600 per apartment unit |
Commercial, industrial, public | $1,800 per 100,000 gals. per year |
Engineering Review | $25 to $100 as determined by Public Services Director |
Group living quarters, motels, hotels | $600 per bedroom |
Multi-Family Residence | $1,800 per dwelling unit |
Septage User | $90/ 1,000 gallons effective July 1, 2020 |
Single Family Residence | $1,800 per dwelling |
Wastewater Rates
Service | Fee |
---|---|
Minimum in advance Effective July 1, 2022 | $350 per 10,000 cubic feet per year, per unit |
Excess charge over 10,000 cubic feet Effective July 1, 2022 | $4.40 per 100 cubic feet |
Water Rates
Service | Fee |
---|---|
Town Turn On and Turn Off Fee | Actual cost per trip |
Damage to Hydrants, Valves, etc. | Actual cost incurred by Town |
Service Installation to property line plus meter material installation and by Town inspection | Actual cost incurred and appurtenant item |
Accounts with inoperative meter pits | Twice annual minimum charge |
Engineering Review Fee | $25 to $100 as determined by Public Services Director |
Construction Inspection: New Residential Projects Lot/Unit- Individual Residential House and Non-Residential Lateral Inspections | $100 per dwelling Actual Cost ($25 Minimum) |
Added charge under an active individual extension contract (includes all Middlebridge area customers) | $125 |
Meter Test - by Utility without request | No Charge plus bill adjustment |
Meter Test - At Customer RequestIf found inaccurate in customer's favor: If found inaccurate in utility's favor: If found accurate: | No Charge plus bill adjustment in accordance with water supply ordinance Actual cost plus bill adjustment in accordance with water supply ordinance Actual cost with no bill adjustment |
Schedule of Water Rates
Meter Size | Quarterly Fee |
---|---|
5/8" | $55 |
1" | $75 |
1 1/4" | $115 |
1 1/2" | $115 |
2" | $160 |
3" | $258 |
4" | $401 |
6" | $802 |
8" | $802 |
Quarterly minimum charge for unmetered customers is double the quarterly minimum assessment.
Quarterly Use
Commodity Rate per 100 cubic feet:
- First 1,250 cubic feet: Included in minimum charge
- 1,250 - 2,500 cubic feet: $3.50
- Over 2,501 cubic feet: $4.00
For existing special rate customers supplied through 1 meter to more than 1 dwelling or unit on the same platted lot, the rates shall be as follows:
Unit | Quarterly Fee | Allowance (Cubic Feet) |
---|---|---|
First Unit | $55 | 1,250 cubic feet |
Each additional unit | $27.50 | 500 cubic feet |
Excess water use over the allowance at commodity rates.
Water furnished by the Utility outside of the Town through 1 meter shall be charged the minimum meter charge if the meter is furnished by the Utility, and a municipal wholesale rate in accordance with the Commodity Rate Structure. The advance payment shall be estimated from the previous year's consumption.
Rates for public and private fire protection shall be charged in advance as follows:
Service | Fee |
---|---|
Public Fire Hydrants | $328 |
Private Fire Hydrants | $328 |
4" Private Fire Connection | $136 |
6" Private Fire Connection | $328 |
8" Private Fire Connection | $587 |
10" Private Fire Connection | $908 |
12" Private Fire Connection | $1,314 |
Soil Erosion Fees
Review and Inspections in conjunction with Soil Erosion, Runoff and Sediment Control Plans pursuant to Article II of Chapter 20.
- Single-family/duplex lots: $100 per lot
- Residential subdivision land development projects during infrastructure construction:
Plus $50 per lot for each lot over 25Number of Lots Fee 1 lot $100 2 - 4 lots $200 5 - 9 lots $500 10 - 15 lots $750 16 - 25 lots $1,000 25 plus lots $1,250 - All other situations involving land disturbance including, but not limited to:
- Commercial
- Demolition
- Industrial
- Land grading
- Landfills
- Mining
- Multi-family
- Parking lots
- Pipelines
- Quarrying
- Utilities
Plus $50 per acre for each acre over 20Land Disturbance Area Fee Up to 30,000 sq. ft. $150 30,000 sq. ft. - 1.5 acres $300 2 acres - 5 acres $500 6 acres - 10 acres $750 11 acres - 20 acres $1,000 20+ acres $1,250